THE UPDATED DESIGN

Inside the district.

Nineteen independently generated architectural studies of the computing-led concept, guided by the updated main layout.

WEST / LOT 196Connect and operateCommunications, landing and engineering.
EAST / LOT 197Research and supportResearch, materials and habitation.
ACROSS THE DISTRICTComputing and infrastructureFunctions are conceptual, not fixed legal allocations.

Illustrative facility placement. The main plan is not a surveyed terrain model or engineering-certified site allocation.

Explore clickable plan and location

THE ARCHITECTURAL COLLECTION

Explore all 19 studies.

Select an image to read its labels. Full-size views are available without cropping.